Towers | 1 |
Floors | 22 |
Units | 1488 |
Total Project Area | 7.85 acres (31.77K sq.m.) |
RETAIL SHOPS
STRUCTURE
RCC/steel structure as per relevant IS code
LANDSCAPE
Landscaped Plaza with water-body Pedestrian Plaza designed with seating areas
Pedestrian Plaza designed with seating areas and food kiosks Dedicated drop-off zone and entrances for retail and landscape features
FINISHES
Exterior: Combination of one or more: glazing, stone, tile, ACP and painted surface etc.
Lobbies: Combination of one or more: stone, tile and painted surface
Basement: Broom finish concrete
Tenant Floor Finish: Concrete floor
Common Toilets: Finished toilets with modern fittings and fixtures
PARKING
Multilevel basements for parking, services and surface parking as per norms
SECURITY
Video Surveillance: Basement driveways, lift lobbies & peripheral security
Manned Security: Boom barriers at all vehicular entry & exit points
FIRE SAFETY
Wet Riser/Hose: Provided as per norms
Reels/Sprinklers/Fire Extinguishers: Provided as per norms
External Fire Hydrants: Provided as per norms
Fire Detection System: Provided as per norms
HVAC
AC System: Provision for Split /Water Cooled DX System
Ventilation and Exhaust: Provided for common toilets and basements as per norms
ELECTRICAL
Distribution: Provision of cable up to tenants premises
Metering: Tenant load will be metered through Intelligent Metering System
Lightening Protection & Earthing Pits: Provided
DIESEL GENERATORS
100% fully automatic backup with suitable diversity and suitable load factor
SIGNAGE
Internal: Main lobby equipped with tenant directory and directional signs
External: External signage as per developers design and conditions
COMMUNICATION CABLE/TV CONNECTION
Provision for Data & Voice
OFFICE SPACES
STRUCTURE
RCC/steel structure as per relevant IS code
LANDSCAPE
Pedestrian plaza designed with seating areas and food kiosks-
Pedestrian plaza designed with seating areas and food kiosks Dedicated drop-off zone and entrance lobby for office floors
FINISHES
Exterior: Combination of one or more: glazing, stone, tile, ACP and painted surface etc.
Ground Floor Lobbies: Combination of one or more: stone, tile and painted surface
Typical Floor Lobbies: Concrete floor and to be finished by Allottee/Tenant
Basement: Broom finish concrete
Unit Floor Finish: Concrete floor
Toilet Blocks: Provision for services will be provided and to be finished by Allottee/Tenant
PARKING
Multilevel basements for parking, services and surface parking as per norms
SECURITY
CCTV Surveillance: Basement driveway, basement and ground floor lobbies
Boom Barrier: At all vehicular entry and exit points including basement entry ramps
Perimeter Security: Boundary wall with manned guard post at entry and exit points
AIR CONDITIONING
Central Air Conditioning up to AHU by developer and low side works by Allottee/Tenant
FIBRE TO HOME
Provision for DTH, Wi-Fi, Intercom connection
DIESEL GENERATORS
Automatic backup with suitable diversity and load factor provided for lighting power and AC
FIRE SAFETY
Wet Riser/Hose: Provided as per norms
Reels/Sprinklers/Fire Extinguishers: Provided as per norms
External Fire Hydrants: Provided as per norms
Fire Detection System: Provided as per norms
ELECTRICAL
Distribution: Provision of cable up to isolater box
Metering: Tenant load will be metered
Lightening Protection: Provided
Earthing Pits: Provided
Emergency Lighting: In select common areas as per norms
SIGNAGE
Internal: Main lobby equipped with tenant directory and directional signs